Emerald Construction built the first Fisher House at the Hunter Holmes McGuire VA Hospital, when it came time for their expansion and the addition of a second house we were selected to partner with The Fisher House Foundation. The second home totaled roughly 15,000 sf and added an additional 21 beds to the capacity for the Richmond location. This two-story wood framed building included an elevator, kitchen, dining room, and common areas.